GET A QUOTES
+65 6908 6660
ediv@ediv.com.sg
GET A QUOTES

Jitterbugs Singapore Dance School (A&A Fit-out)

Project Description

Client: Jitterbugs Dance School
Construction Period: Aug 2022 – Dec 2022
Scope of works: Air-conditioning and Mechanical Ventilation, Electrical, Fire Protection, Plumbing & Sanitary Systems and Security Systems.

Project Overview and Challenges:

  • This project involved the design and build of complete mechanical and electrical (M&E) systems for a new dance studio located within a mixed-use shopping and office complex.
    One of the key design challenges was to achieve an acoustic performance of NC30, ensuring a comfortable and quiet environment suitable for dance activities despite being surrounded by commercial spaces.
  • The lighting design also required careful consideration — the client’s selection of a matte black dance floor finish made it necessary to achieve optimal brightness without glare, providing a visually balanced and comfortable space for both instructors and students.
  • Through close collaboration with the Architect, client and end-user, our team successfully completed and handed over the project within budget and the tight timeline, delivering a high-quality facility that met both acoustic and visual performance standards.
24/7 SUPPORT
+ 124 45 78 678
Email us
info@ediv.com
Opening Time
Mon - Fri : 08.00 - 17.00
Copyright © 2026 All Rights Reserved
cross